A complete calculation has five parts. The first is the obvious one. The other four are where the return actually compounds.
1. Direct labor savings
The straightforward piece: the difference between what a US production hire costs fully burdened and what the nearshore equivalent costs. For a single mid-level Revit drafter, this is typically $45,000 to $55,000 per year. For a BIM coordinator, more.
This is the floor of your ROI, not the ceiling.
2. Recovered billable time (the one most firms miss)
This is the largest and most overlooked component.
When production work overflows onto project architects and principals, the firm is paying its most expensive people to do work that a drafter should handle. Every hour a principal spends producing CDs is an hour not spent on design, client relationships, or business development, the activities that actually generate revenue.
Industry data shows firms reclaim 10 to 14 hours per week of licensed architect time when production and support work moves to dedicated staff. Put a number on that:
| Freed principal time |
Value at $150/hr billable |
Value at $200/hr billable |
| 8 hrs/week |
$62,400/yr |
$83,200/yr |
| 12 hrs/week |
$93,600/yr |
$124,800/yr |
Not all freed time converts to billable work one for one. A realistic capture rate is 50 to 70%. Even at the conservative end, recovering half of 8 hours a week at $150 an hour is over $30,000 a year in recovered leverage, on top of the direct labor savings.
3. Capacity gains
Fixed in-house headcount caps your output. You can only take on what your current team can deliver, and expanding means a 45 to 60 day recruiting cycle before anyone is productive.
Flexible production capacity changes the equation. When you can scale production up for a surge without hiring, you can pursue and accept work you would otherwise have declined or hedged on. The value of one additional project per year, at a typical fee of $150,000 to $300,000, dwarfs the hourly savings that made the capacity possible.
This component is harder to quantify precisely, but for a growing firm it is often the single largest source of return.
4. Avoided recruiting and onboarding
Every in-house hire carries costs before they produce a billable hour:
- Staffing agency placement fees: 15 to 25% of first-year compensation, or $11,700 to $19,500 on a $78,000 role
- Or, for direct recruiting: 3 to 6 weeks of project lead and principal time on sourcing and interviews
- 45 to 60 day vacancy periods in tight markets, during which the capacity gap is absorbed elsewhere
- 4 to 8 weeks of ramp time to full output, with project lead supervision throughout
A staffing partner that delivers a pre-vetted shortlist in 7 to 10 business days removes most of this. The avoided cost per hire is real and recurring in a growing firm.
5. Eliminated fixed cost and equipment
In-house staff are a fixed cost carried through slow periods, project delays, and demand troughs. Flexible capacity scales with your project load instead.
There is also a hardware line most firms forget. A production-grade workstation runs $2,500 to $4,500, amortized at $500 to $1,500 per person per year. Nearshore contractors provide their own computer, internet, and equipment, so that cost disappears entirely. Software licenses stay with your firm in both models.